The one formula you actually need
Concrete is sold by volume, so the whole job comes down to one calculation. Measure the length and width in feet, and the thickness in inches. Then length x width x (thickness / 12) gives cubic feet. Divide that by 27 and you have cubic yards, since one cubic yard is 27 cubic feet. For a standard 4 inch slab, divide the square footage by 81. Honestly, the formula is the easy part. The mistakes happen before you ever touch a calculator, when the measurements are wrong, so measure twice.
Work it out on a real slab
Let's do a real one. Say you are pouring the floor of a 12 by 10 foot room, 4 inches thick. First, 12 x 10 x (4 / 12) = 40 cubic feet, which is 1.48 cubic yards once you divide by 27. Then the step people skip: add 10 percent for waste. Ground is never perfectly flat, and some concrete always stays in the wheelbarrow. So 1.48 x 1.10 = 1.63 cubic yards. That is the number you order.
When I tested this exact slab in our concrete calculator, it came back with the same 1.63 cubic yards, plus 44 cubic feet and 74 bags of 80 lb mix. One typo can quietly double your order, so the cross-check is worth it.
Prefer watching? This 7-minute walkthrough shows the same volume math on a real patio slab.
How many bags is that, exactly?
If you are mixing by hand, the yardage number is only half the story. Each bag size covers a fixed volume: an 80 lb bag gives about 0.60 cubic feet, so 45 bags make one cubic yard. A 60 lb bag gives 0.45, so 60 make a yard. A 40 lb bag gives 0.30, so 90 make a yard.
Take the 10 by 10 foot patio everyone asks about. At 4 inches thick it is 1.23 cubic yards. Add 10 percent waste and you get 36.67 cubic feet, which works out to 62 bags of 80 lb mix. Buy only 56 and you run short the moment the ground dips. Always round up. A spare bag costs a few dollars, but a second trip costs an afternoon.
Don't forget the footings
Here is the gap in almost every guide I read: they cover slabs and stop. But plenty of jobs need footings too, and a footing uses the same formula. Picture a strip footing 30 feet long, 12 inches wide and 12 inches deep. In feet, that is 30 x 1 x 1 = 30 cubic feet, or 1.11 cubic yards. Add 10 percent waste and you are at 1.22 cubic yards, about 55 bags of 80 lb mix.
My blunt opinion: if your project has both a slab and footings, work them out separately and add the two numbers together. Lumping everything into one rough guess is how you end up calling the supplier in a panic mid-pour.
Bags or a ready-mix truck?
Once you know the volume, the next question is how it arrives. The crossover point sits near one cubic yard, about 45 bags of 80 lb mix. Below that, bags usually win: no delivery fee, you mix at your own pace, and a 4 by 4 foot pad is 9 bags, an afternoon job. Above that, a ready-mix truck wins on price and on your back. Bagged mix runs roughly 315 to 405 dollars per cubic yard, while delivered ready-mix runs about 150 to 200 dollars a yard.
Get your exact number in 30 seconds
You can do all of this on paper, and now you know how. But if you want the answer without the arithmetic, our concrete calculator does the whole thing: type in the length, width and thickness, and it gives you cubic yards, cubic feet, and the bag count for 80 lb and 60 lb bags in one go. It sits alongside our other calculators, all free. Measure once, check the math, add your 10 percent, and order with confidence.
Frequently asked questions
How much concrete do I need for a 10x10 slab?
At 4 inches thick, a 10 by 10 foot slab needs 1.23 cubic yards, or 1.36 with 10 percent waste added, about 62 bags of 80 lb mix.
How many 80 lb bags of concrete are in a cubic yard?
About 45. One 80 lb bag yields 0.60 cubic feet, and a cubic yard holds 27 cubic feet. For 60 lb bags it takes 60, and for 40 lb bags it takes 90.
How much extra concrete should I order for waste?
Add 10 percent for most home projects. Use 5 percent only if the ground is level and the forms are exact.
Should I order bags or ready-mix concrete?
Bags make sense under about one cubic yard. Above that, ready-mix delivery is usually cheaper and far less work. Ask for the delivered price, including any short-load fee, first.